|
The Wallersdorf–Münchshofen railway was a metre gauge railway in the province of Lower Bavaria in southern Germany. It was operated from 1926 to the end of 1949 by the Wallersdorf and Country Narrow-Gauge Railway Cooperative (''Kleinbahngenossenschaft Wallersdorf und Umgebung'') whose head office was in Büchling. The line started from the station in the market town of Wallersdorf, in Dingolfing-Landau district, and ran to Münchshöfen in the municipality of Oberschneiding, in Straubing-Bogen district. The railway was exclusively used by goods trains. == Construction of the line == The Lower Bavarian market town of Wallersdorf lies in the lower Isar valley, 20 kilometres from where the River Isar flows into the Danube near Plattling. Today the town is served by the electrified, single-tracked line from Landshut to Plattling (KBS 931). The station's former marshalling and loading yards − at kilometre post 52.9 – have been dismantled apart from a simple crossing loop for the current regional passenger and goods trains. The construction of a standard gauge railway from Straubing to Landau an der Isar had been approved in 1869 and from 1872 onwards the Gäuboden communities, led by the town of Straubing, made persistent attempts to have it built, but these efforts remained unsuccessful. As a result, local farmers founded a cooperative to build a narrow-gauge line (''Kleinbahn'') with a junction on the Landau–Plattling railway. According to Zeitler, the cooperative was given approval to build the line by a Bavarian law passed on 26 June 1908; the authorised route running from the station in Wallersdorf via Büchling to Münchshöfen. On the largely flat valley of Gäuboden the railway was intended to supply the farmers with goods (fertiliser, coal and building materials) and especially during harvest to transport away produce, mainly sugar beet and cabbages, in a cost-effective manner. The German Empire and the Free State of Bavaria each contributed 90,000 Reichsmarks (RM) to the cooperative's capital investment of 187,000 RM. The remainder of the capital was raised from the participating communities and farmers. Construction did not begin until after the First World War. It was intended to purchase narrow-gauge track and vehicles with a gauge cheaply from former Army stock. When this failed, the railway embankment, which had been completed in 1923, was widened to take a gauge line and the railway went into service on 6 August 1926. The line had a length of and a track length of The line ran northwards from the Reichsbahn loading yard at Wallersdorf station via Vierhöfen (km 2.5) towards Mattenkofen (km 4.2). One kilometre before the village it swung west and reached Büchling (km 5.8) about 500 m north of the village. This was the location for the depot with its coal bunkers, water tanks and a small workshop. Having run on level terrain to this point, the line now ran up a considerable incline of 1:30 for about 250 m in the direction of Münchshöfen. The course of the railway alongside the road to the vicinity of Mattenkofen can still be made out from the trees and bushes on the overgrown trackbed. The line continued on over the field track known as the ''Rennweg'' to the goods station of Münchshöfen (km 7.7) on the road to Fierlbach. Evidently the railway had run-around loops in Wallersdorf and Büchling, and presumably at the terminus in Münchshöfen too. All the loading yards had a section of standard gauge track onto which the standard gauge wagons were off-loaded with the help of oxen or horses. That enable the transporter wagons to be freed up to transport other wagons, whilst the goods wagons were loaded or unloaded. A proposal in 1928 by the Regensburg Reichsbahn division to the town of Straubing and other communities in the Gäuboden along the line to Landau to connect it to this branch line was not accepted. Even an extension of the line by about 4 km to Oberschneiding could not be put into effect due to a lack of capital. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Wallersdorf–Münchshofen railway」の詳細全文を読む スポンサード リンク
|